Project Data Sheet
- Shathe fashion...
- Well Dresses-1....
- South China....
- Well Dresses-2....
- PTI Building....
- Opex Sinha-1....
- Opex Sinha-3....
- Opex Sinha-4...
Narrative Description of Project:
- Network Switch: Cisco SG300-28-port 10/100/1000 Gigabit
- Managed Network switch with standard accessories
- Network Cable: CAT 6 Dlink (Coil)
- Connector: Cat 6 RJ45 connector Box, PVC Channel setup with Installation
- Dell Server: Dell power Edge T110 II Tower 4-Core Server-16 GB Hardware RAID Processor: Intel Xeon E3- 1220v2, 3.10 GHz, 8MB Cache, 4 Core, Chipset: Intel C202
- Memory: 16 GB (2X8GB), 1600 Mhz, Dual Ranked, UDIMMs
- Hard Drive: 3 X 1 TB 7.2 K RPM SATA
- RAID: PERC H200 Adapter
- Optical Drive: 16 x SATA DVD = / - RW Drive
- Monitor: No Monitor
- LAN/NIC: Single Port Gigabit Ethernet
- Power Supply: Single
- Installation and configuration.
Description of actual services provided by the Staff within the assignment:
- System Design: developing programs for expense calculation, budget determination, and cost estimation and attendance management as per client requirements.
- Network Design Implementation: network design services for medium to large sized workplaces. Server and database setting up and management integrated with high-speed connectivity are ensured for the clients.
Narrative Description of Project:
1. Architectural Design
- Detail architectural plan with elevations and section as per required building occupancy
- Detail architectural working drawing along with occupancy plan
2. Structural Design
- Detail analysis of structural part as per Alliance Standard and BNBC 2006
- Detail working drawing for construction of structural part
3 Foundation Design
- Foundation design based on the structural analysis and sub-soil condition
- Detail working drawing for foundation construction
4 Design Report
- Design report as per Alliance or ACCORD Standard
- Detail information about material properties for construction
5 Construction Supervision
- Top supervision as per architectural and structural design
- Checking material quality during the construction period
Description of actual services provided by the Staff within the assignment:
- Architectural Design
- Structural Design
- Checking and compliance as per BNBC
Narrative Description of Project:
Objective
- Retrofitting works of South China Bleaching and Dying Factory Buildings is a single storied main shed with mezzanine floor and a single storied boiler shed. Total 32 columns and 31 rafter steel structure will be retrofitted.
- Supply of MS Plate/T section column, Bracing, end Plate, Connection Plate, stiffener etc (ASTM A570-50, Yield strength 50 Ksi for T section, 36 Ksi for MS Plate).
- Supply of 19 mm dia (125 mm length). Bolt with Nut. All work will be completed as per design – drawing and specification.
- Supply of post installed Epoxy adhesive Anchor 12 mm dia, 125 mm length (HIT-HY 200+HIS-N B7 ½ inch HAS-E or Equivalent) and Anchoring Chemical/Epoxy for Nut, Bolt and Shear Stud in superstructure members as per design all complete, delivery at site.
- Running Welding (6 mm) with existing MS plate for column, bracing, stiffener, base plate, End Plate/Gusset Plate, Connection Plate, etc all works will be completed as per design-drawing and specification.
- Supervising of all the construction works will be performed as per retrofitting design.
Description of actual services provided by the Staff within the assignment:
- Quality Assurance of Retrofitting Work
- Supervised the team for quality Retrofitting design.
Narrative Description of Project:
Objective
- Dismantling RCC Grade Slab, CC Slab and Damaged brick works.
- Earth working of Excavation of all kinds of soil,
- 75 mm thick CC Casting (1:3:6) by using brick chips as a course aggregates under base or floor in/c the supply of water, electricity and other charges and costs of tools and plants etc., all complete as per Direction of the engineer-in-charge.
- Supplying, fabrication and fixing to details as per design M.S. deformed bar as reinforcement of required size and length for all types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc., complete as per specifications, drawings and direction of the Engineer-in-charge.
Description of actual services provided by the Staff within the assignment:
- Architectural Design
- Structural Design
- Checking and compliance as per BNBC
Narrative Description of Project:
Objective
1) As built drawing:
- Details structural as built drawing
- Four (4) side elevation with two (2) sectional view
- Load management and layout plan (if needed)
2) Testing for material strength
- Concrete core collection and testing (both destructive and non-destruction) for concrete strength.
- Foundation exploration and corresponding size investigation at least 3 locations (Corner, Edge, middle)
- Soil investigation report (Bore logged data at least two locations)
- Collection of existing Rebar and yield strength test
- Rebar-scanning in columns, beam and slab for detecting existing condition.
- Investigation of embedded pile length (if needed).
3) Testing of Masonry Building
- Direct shear test
- Mortar strength test
- Brick strength test.